For insurers & brokers Claims · Risk · Underwriting

Know what reached the property
before the claim was filed.

When your policyholders run TENA, every supply event at their property is timestamped and stored off-site. Their claim pack shows what electrical event reached the site, and when, so assessment starts from a record rather than a recollection.

Where the cost sits

Electrical damage claims turn on one missing thing: a record of what the supply actually did.

01

Events leave no trace

Surges and sags last milliseconds. Weeks later, only the damaged equipment is left to inspect.

02

Grid-wide or one property?

Without measurement at the site, a network event and a local fault look the same on paper.

03

Silent failures go unseen

A spent surge arrester or a bad restart pattern goes unnoticed until it becomes a claim.

A claim today
  1. Loss reportedThe policyholder attributes equipment damage to a power event.
  2. Site visit arrangedThere is no other way to form a view of what happened.
  3. Event inferredDays or weeks later, from whatever survived.
  4. Decision made on limited informationWith no record of the supply at the time.
A claim with TENA
  1. Loss reportedThe event is already on record.
  2. Claim pack providedVoltage, current and frequency at the property around the time of the failure.
  3. Event placed in contextWhether nearby sites on the same network recorded the same event.
  4. Assessment starts from evidenceYour assessors decide, with a record of what reached the site.

TENA documents what electrical event reached a property, and when. It does not claim to establish what caused a particular failure. That remains your assessment.

From live sites

What the record showed.

C/01
Failure flagged early

A valid CoC that was no longer true

Earth impedance had degraded and the surge arrester was close to failure, on a property with a clean certificate of compliance. Both were flagged early and the owner remediated before anything failed.

SPD OK
C/02
Event identified

A generator, not the grid

During municipal powerline work, voltage fell to 194V and frequency rose to 52.8Hz, the signature of a generator supply. Without the record the event would have been described as a grid fault.

Voltage: 230.0V · Freq: 50.00Hz
C/03
Imbalance measured

Load imbalance nobody had noticed

L2 was carrying 48% of total load against a 33% balanced norm. Structural, not transient: the kind of condition that quietly ages equipment. Correcting it is electrical contractor work; the measurement showed where to look.

L1 · L2 · L3
C/04
Event corroborated

Five sites, one recorded event

TENA devices at five sites across Kloof recorded the same voltage sag at the same instant, showing it was an eThekwini network event rather than a fault at any single property.

1 event · 5 sites

* Full event records available under NDA

Portfolio view

One event. Five sites.
One consistent record.

A network of devices shows whether an event was on the wider network or began and ended at one property.

TENA monitoring network map
1 EVENT · 5 SITES · eTHEKWINI NETWORK EVENT
Examples of TENA installations across residential and commercial sites, March to May 2026
INSTALLATIONS · MAR TO MAY 2026
15+
Live sites
4
Documented event cases
4
Certifications
All of SA
Available nationwide
Certified for permanent installation
on live distribution boards
EMC & LVD
Passed · Mar 2026
NRCS
Authorised · Mar 2026
ICASA
Authorised · May 2026
CE (Europe)
Certified · Jun 2026
Get started

Talk to us.

If you handle electrical claims, risk or underwriting in South Africa and your policyholders run TENA, or could, we would welcome a conversation.

Address
75 Lewis Drive, Amanzimtoti, KwaZulu-Natal
Please enter your name.
Please enter a valid email address.
 

Get a quote →